Small defects are easier to fix before they become bigger handover issues.

The Rogue Files show recurring patterns that builders can address before client handover and buyers can document before acceptance.

Construction defect examples from handover inspections

Documenting issues early improves practical outcomes for both parties.

Poor finishing

Uneven plaster, paint defects, rough edges, and incomplete touch-ups.

Tile and grout issues

Lippage, gaps, poor falls, cracked grout, and inconsistent set-outs.

Sealant and wet-area defects

Missing, messy, or poorly bonded silicone around wet-area details.

Fit-off defects

Doors, windows, cabinetry, hinges, handles, and locks that need correction.

Alignment and level issues

Out-of-square frames, visible movement, and level inconsistencies.

External and drainage issues

Falls, runoff and finish details that need correction before completion.

Selected examples from live case study topics.

Laundry door

Rear patio finish

Where does the wall start

Window head sagging

60mm out on investment house

Sloping floor

Builder thought we were being too picky

The leaning tower of Pisa?

Explore all case-study themes

Defects become builder-ready action within 24 hours.

01

Book online

Tell us about the property, builder, and timing so the inspection can be coordinated quickly.

02

We liaise with your builder

Handovers.com coordinates access and timing so your inspector can focus on the property.

03

Expert inspection

A construction expert checks finishes, fit-off, wet areas, doors, windows, surfaces, and safety details.

04

Report within 24 hours

Your tailored site-specific report is sent to you and your builder so defects can be addressed.

Understand what is checked and choose your builder or buyer pathway.